Airport Runway Reconstruction - Sargent

Airport Runway Reconstruction

Client
Town of Princeton
Location
Princeton, Maine
Services Provided
General Contractor
Market

Key Facts

  • This project required the reconstruction of 4,300 linear feet of runway including a 20 foot fill on the south end to bring the runway up to compliance. Crews also reconstructed portions of Taxiways A & B and constructed a new Taxiway C. This contract required the airport to shut down for 100 days while crews completed the project. Rock excavation was completed using a D10 dozer and excavators with hoe rams.

Work Included

  • 92,000 cubic yards of Common Borrow
  • 20,000 cubic yards of Rock Excavation
  • 77,000 cubic yards of Reclaiming
  • 48,000 cubic yards of Subbase Gravel (P154)
  • 8,900 cubic yards of Base Gravel (P208)
  • 8,900 linear feet of Underdrain
  • 6,500 linear feet of Storm Drain with 12 Basins
  • 11,000 linear feet of electrical trenching
  • 7,400 tons of Asphalt (M401)