Fort Halifax Dam Removal, Winslow, ME
Winslow, Maine
Owner
FPL Energy Maine Generation
700 Universe Blvd-CDP/JB
Juno Beach, FL 33408-2657
Project Type
Dam Removal
Sargent Corporation’s Role
General Contractor
Engineer
E/PRO Engineering
249 Western Ave.
Augusta, ME 04330
(207) 621-7000
Start/Finish
July—Oct. 2008
Description/Significance
Unique Job Conditions/Characteristics
Heavy rain led to rising river levels.
Had to breach dam carefully to lower water level behind dam 2 feet per day.
Utilization of state-of-the-art demolition equipment.
After breach was complete, demolishing the 350-foot-long concrete dam began, and removal of debris from the river.
Volunteers transported fish and mussels that were trapped in pools.
Archaeologists found hundreds of Native American artifacts from an early settlement in the area .
Services Provided by Sargent
General contracting services for all demolition and dam breaching.
Benefits
Project completed on time and within budget.

Download PDF of this Project